Editorial diagram: FDD Item 7: turn the investment table into a site budget
Editorial diagram. A topic-specific research checklist, not a verified brand result or an earnings forecast.

Item 7 is the US FDD’s estimated initial-investment section. The next task for a buyer is to understand the assumptions behind the range and replace unresolved allowances with evidence for the proposed project.

Preserve the original definitions

Copy categories, ranges and explanatory notes into a working register without changing what they describe. Record which format and assumptions apply. Keep any stated period for additional funds visible rather than treating it as a promise that no further cash will be needed.

Build the proposed-site column

Add current quotations, deposits and local requirements beside the disclosed ranges. Explain differences instead of forcing the local budget to match the table. An unusually low quote can reflect missing work, while a high estimate may reflect a materially different premises condition.

Separate opening and continuing cash

Link each item to when it is paid and which funding source will cover it. Maintain a separate operating cash schedule. An investment table is not a personalised assurance that launch losses, household costs and financing obligations are all covered.

A worked research example

Illustrative example: a disclosed equipment allowance ranges from 40,000 to 60,000, but your delivered-and-installed quote is 64,000. Record the 64,000 and investigate the difference; do not substitute the 50,000 midpoint simply because it falls within the published range.

Evidence to gather

  • Retain Item 7 categories and notes
  • Identify the format and reserve assumptions
  • Add site-specific dated quotations
  • Reconcile payment timing with funding

The worksheet below uses editable example inputs. It does not automatically reproduce the scenario or every calculation rule discussed above.

Opening budget

What will it take to open?

One-off + reserve
Edit the example · all fields required
Updates as you type
Total opening budget—Enable JavaScript to use this worksheet.
Illustrative result

Example inputs, not a brand quote. Amounts stay in your browser.

Method & assumptions

Sum of the five categories. Add each cost once: a quoted package may already include the franchise fee or equipment. Currency changes the display label only; no exchange conversion is applied.

Frequently asked questions

Is the midpoint a recommended budget?

No. A midpoint does not establish the cost of your actual project.

Does a disclosed range guarantee the final cost?

No. Obtain evidence for the site, format and timing you are considering.

Can this replace the current FDD?

No. Read the complete current document and seek appropriate US advice.

Sources and scope

References checked 6 November 2026. The questions, examples and diagrams are our editorial research tools; they are not statements that every franchise has the same terms.

General editorial information, not personalised legal, tax or financial advice. Confirm local requirements and the actual documents with appropriate advisers. Examples are hypothetical. Contact the editor or suggest a correction.